PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed roof curbs at the High Roof Facing West.jpg Installed storm piping at the high roof Facing South-East.jpg Installed temporary lighting at the 4th floor Facing East.jpg Installing storm piping at the 3rd floor Facing North-East.jpg Erecting stone panels at the 4th floor East Elevation.jpg Erecting the stone panels at the East Elevation UCIA Roof 1.jpg Erecting the stone panels at the North Elevation UCIA Roof 5.jpg Installing wood blocking along the high roof parapet Facing West.jpg Erecting the stone panels at the North Elevation UCIA Roof 3.jpg
Previous pageNext page Erecting stone panels at the 4th floor East Elevation
Erecting stone panels at the 4th floor East Elevation